Each insulating aerial device shall be periodically electrically tested to verify the dielectric resistivity and detect conductivity changes in its insulating sections. This includes visual inspection and the following testing and inspecting:
We uphold the highest safety standards available and exceed our customer expectations. Our fleet is state of the art and our business continues to expand throughout New England.
Digger derrick units shall be inspected and tested and shall include inspection of digger auger assembly